S2E9 Insulating the Slab
Trending Episodes
•
TV-PG
Foundation installation is complete, and slab preparation is in progress. Selected waterproofing products will enhance the warranty. Structural foam fill is used for insulation and support under the slab, which has varying thicknesses. An ejector pump is installed for the basement bathroom, and rough plumbing is set up. A future vent drain is added, and a stairwell is built for access. Framing preparations are underway, scheduled to start in three weeks.
Up Next in Trending Episodes
-
S1E12 Six Months In: Progress, Storm ...
Six months after leaving Southeast London, Gavin and Nicole look back on the progress made at their derelict Welsh farmhouse and across the surrounding 13.5 acres. Overgrown land has been cleared, major repairs tackled, and key decisions made to modernize the house without losing its character. S...
-
S1E10 A Myriad of Work
-
S2E11 The House Is Finished—and Life ...
With construction complete, Lauren and David turn their focus to living in the space they worked so hard to create. A new rug collection takes shape with hands-on family input, while shifts in designer partnerships open the door to future possibilities. As winter sets in, a zinc kitchen counterto...