S2E6 More Rotten Floor...
Trending Episodes
•
TV-PG
The West Wing tower inspection shows a new roof and solid timber, with no leaks found. Insulation is added for warmth and reduced oil use. During the renovation of the downstairs toilets, old fixtures are removed, revealing soft joists that require replacement. Plans are set to fix the flooring and joists. The driveway is also cleared of mud and grass to improve access during inclement weather.
Up Next in Trending Episodes
-
S4E20 How to Screw Up a 300ft French ...
A water problem leads to outdoor projects aimed at enhancing the yard before a wedding. Drainage issues are addressed through the installation of a French drain, utilizing non-woven geotextile fabric and specialized drainage pipe. The process includes installing a catch basin, adapting for variou...
-
S4E8 Toilet Install on a Concrete Slab
The plumbing project begins with assessing the plumbing system and gathering necessary fittings for toilet installation. It involves cutting pipes, securing flanges, and overcoming challenges with flange fit due to concrete irregularities. After addressing glue consistency issues, the toilet is p...
-
S1E14 Hiding cabinet screws
Space constraints challenge the shop while managing multiple projects. Recent decluttering efforts support ongoing work. Preferences for cabinet hardware highlight the benefits of magic corners and trash units. Techniques for cabinet installation focus on hinge mounting and blocking for stability...