S2E3 Fixing Our Moisture Control
Trending Episodes
•
18m
The site visit highlights moisture prevention strategies in the Back Bay location. It emphasizes using subfloor and coatings to keep moisture out of living spaces and addresses concerns about soil moisture affecting hardwood floors. A six mill poly vapor barrier is installed to mitigate moisture issues. The installation of steel beams for structural support is detailed, along with the design of the staircase. The overview concludes with upcoming framing work and layout consistency.
Up Next in Trending Episodes
-
S2 E5: Thistle Hill - Masonry, Window...
Brent shares an update on the Thistle Hill restoration project, focusing on the nearly completed exterior work. Key tasks include masonry and foundation work, the installation of a new copper flat roof, and the restoration of historic windows. Attention is given to using quality materials to ensu...
-
S4E12 Are We Stone Masons Yet?
The project faces initial delays due to rain but resumes as conditions improve. The team learns masonry skills while installing natural stone veneer, focusing on quality control and various techniques. They discuss mortar mixing ratios for optimal strength and workability, create a wooden jig for...
-
S1E22 Chateau Flooring
The renovation focuses on updates in the dining room and bathroom. The dining room flooring is nearly finished, with parquet installation pending. The bathroom is close to completion, waiting for tile samples. Challenges with flooring and joist replacement are addressed, along with insulation eff...