S2E3 Excavation in New England Weather
Trending Episodes
•
TV-PG
The Needham project showcases collaboration with TE Design Group, emphasizing demolition and site work. Groundwater management is essential, with design changes for seasonal adjustments. The foundation elevation is set to prevent flooding, while excavation faces challenges with shale and ledge. Water management strategies are in place for a dry site, and a geo engineer assesses soil. Protection for a sweet gum tree is prioritized, with plans for foundation work and drainage setup ahead.
Up Next in Trending Episodes
-
S1E2 Fence Building
Lauren introduces a vegetable garden project aimed at involving children in gardening activities. The garden layout features specific dimensions and comfortable walkways. The family digs holes for fence posts and levels them with concrete. Kids participate in assembling raised garden beds, design...
-
S1E7 Touring the Farm and Planning th...
Gavin and Nicole step back to tour their smallholding, sharing progress across the wider farm beyond the main house. They explore the history of the piggery, assess the condition of the old cottage and tractor shed, and outline plans to restore each space while preserving the property’s character...
-
S1E20 New Windows Go In as the Farm M...
A major visual shift arrives as new windows replace failing originals, bringing light, views, and fresh momentum to this old house renovation. Family members lend a hand as demolition uncovers more structural fixes that need attention, reminding everyone this fixer upper still has lessons to teac...