S2E15 Framing & Lifting Walls
Trending Episodes
•
20m
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor bolts. The team faces challenges while squaring and raising the walls but successfully completes all exterior walls and gets ready for garage door headers.
Up Next in Trending Episodes
-
S1E5 Making Curved moulding
This episode showcases a new format and enhanced video quality while demonstrating the creation of a curved crown. It covers the steps of removing the existing crown, cutting layers, and assembling them with polyurethane glue for durability. The molder is set up for precise profile cuts, and the ...
-
S3E9 Installing Metal Soffit and Fascia
Fascia and soffit play vital roles in house construction. The journey starts with an overview and the use of durable 29 gauge steel. Proper ventilation is ensured by blocking spaces between rafters. Installation involves pre-cut soffit panels and metal fascia, with a focus on safety and precision...
-
S3E6 Prepping For A Multi-Million Dol...
This project focuses on constructing a staircase with temporary support, later replaced by LVL stringers for added strength. It includes features like a two by four for rigidity and soundproofing with mineral wall insulation. Plywood treads and risers are installed, integrating plaster walls for ...