S2E15 Framing & Lifting Walls
Trending Episodes
•
TV-PG
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor bolts. The team faces challenges while squaring and raising the walls but successfully completes all exterior walls and gets ready for garage door headers.
Up Next in Trending Episodes
-
S2E24 Roofing Membrane Application
A chimney is being constructed with a wood-burning insert, using reclaimed brick for a natural appearance. Cedar shingle siding and a liquid applied roof membrane are installed for waterproofing. The project focuses on proper water table and drainage management. Substrate preparation and polyeste...
-
S1E6 Prepping For A Multi-Million Dol...
This project focuses on constructing a staircase with temporary support, later replaced by LVL stringers for added strength. It includes features like a two by four for rigidity and soundproofing with mineral wall insulation. Plywood treads and risers are installed, integrating plaster walls for ...
-
S2E17 The Benefits of Your Own Mill Shop
Explore the design and functionality of a custom floor guide made from delrin, known for its low friction and stability. Learn about the challenges in fabricating an HVAC panel and the importance of precise measurements. Discover the process of matching pocket doors and constructing a door frame ...