S2E10 Cleaning the Chateau with Toothbrushes
Trending Episodes
•
TV-PG
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, using an improvised toothbrush, while managing dust from plaster removal is a concern. Wall removal is also necessary to ensure a level and square structure for tiling.
Up Next in Trending Episodes
-
S3E12 Curved Staircase Installed
The Back Bay project showcases a collaboration with architect John Buckley, focusing on offsite stair fabrication for precision. The team enhances efficiency while carpenters install crown molding and wall paneling using the Cucu Brothers molding package. A combo core material ensures a flat surf...
-
S1E18 Sheathing the Swooping Roof (Gl...
-
S1E6 Inside Look at Kitchen Cabinet I...
The process starts with cabinet installation, setting control points, and measuring countertop heights while adjusting for rivets. Unique design features include under-counter appliances and a divider between the refrigerator and freezer, optimizing space. Stability is achieved by installing shel...