S2E1 Transforming a Brownstone: Renovation Insights
Trending Episodes
•
11m
This project showcases a brownstone renovation that prioritizes air tightness and significant improvements. A Preco product is used to tackle moisture and air issues. The process includes wall preparation, floor leveling techniques, and addressing renovation challenges. The staircase design transitions from a standard winder to a natural spiral, enhancing aesthetics. Collaboration with John Buckley Architects is emphasized, with updates promised for the future.
Up Next in Trending Episodes
-
S2E7 Our $12k Driveway Washed Out
A recent rainstorm caused significant erosion on a driveway, highlighting the importance of proper water management. Unlike the previous year, this damage prompted the implementation of erosion control measures, including a rock pond. Plans for repair involve both machinery and manual labor. Afte...
-
S2E15 Framing & Lifting Walls
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor b...
-
S1E5 Making Curved moulding
This episode showcases a new format and enhanced video quality while demonstrating the creation of a curved crown. It covers the steps of removing the existing crown, cutting layers, and assembling them with polyurethane glue for durability. The molder is set up for precise profile cuts, and the ...