S1E8 Demolition Chaos as Ceilings Come Down and Plans Take Shape
Trending Episodes
•
20m
Demolition ramps up as Gavin and Nicole strip ceilings and walls back to expose the true condition of their Welsh smallholding. Damp issues and poor past work come to light, reinforcing the need for breathable materials and proper structural upgrades. As usable materials are salvaged and waste is cleared, plans take shape for new plumbing and underfloor heating. Kitchen demolition brings its own challenges, but steady progress—and a brief break at the beach—helps reset before the next phase of the build.
Up Next in Trending Episodes
-
S1E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...
-
S1E14 Understanding Structural Detail...
The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved perf...
-
S2E8 Turning the Finished House Into ...
With construction moving at remarkable speed, Lauren and David watch the house shift from build site to living design experiment. Temporary furniture and decor are staged for a photo shoot as final details fall into place. Outside, carefully chosen plantings support wildlife and biodiversity, tur...