S2E11 The Slab Pour was a Disappointment

Close Open

S1E4 What is Ranch and Mid-century Architecture?

Trending Episodes • 7m 58s

Up Next in Trending Episodes

  • S2E11 The Slab Pour was a Disappointment

    Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...

  • S3E20 Framing Lifting Staircase Solo ...

    Stair construction experiences an eight-month delay as other tasks take priority. The builder uses stringers, measuring rise and tread accurately with tools like stair gauges and a framing square. A mock-up ensures proper fit, and stringers are cut with precision. Installation addresses challenge...

  • S2 E5: Thistle Hill - Masonry, Window...

    Brent shares an update on the Thistle Hill restoration project, focusing on the nearly completed exterior work. Key tasks include masonry and foundation work, the installation of a new copper flat roof, and the restoration of historic windows. Attention is given to using quality materials to ensu...