S1E32 Building Details Come Together
Trending Episodes
•
11m
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed brick tile, while kitchen cabinetry is being installed. A bunk bed is being crafted to match the trim, and air conditioning units are set up to manage humidity.
Up Next in Trending Episodes
-
S2E16 Slow Living in a Fairy Tale
Each morning offers a chance to shape the day with intention, balancing slow beginnings and busy tasks. The process of creating a home involves family, nature, and daily routines that provide calm amidst chaos. Gardening and caring for geese foster joy and connection to the environment. As new ad...
-
S1 E7 Recreating the English Tavern
The tavern space is being transformed with exciting features, including hidden doors and clever storage solutions. The bar area highlights historic linen fold panels and intricate designs, with adjustments made to blend original and new elements. The aim is to create an English pub atmosphere, sh...
-
S3E15 Delivering cabinets in a histor...
The kitchen installation process starts with preparing cabinetry and tools while facing challenges from the dense neighborhood and narrow roads. Accessing the building requires navigating narrow stairs and using a back door, as the small elevator limits transport options. Despite a temporary manp...