S1E3 Swiss construction site with intense building detail
Trending Episodes
•
TV-PG
Up Next in Trending Episodes
-
S2E11 The Slab Pour was a Disappointment
Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...
-
S1E22 Chateau Flooring
The renovation focuses on updates in the dining room and bathroom. The dining room flooring is nearly finished, with parquet installation pending. The bathroom is close to completion, waiting for tile samples. Challenges with flooring and joist replacement are addressed, along with insulation eff...
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...