S1E23 Pouring Concrete Footings
Trending Episodes
•
16m
Water management presents challenges during construction as significant accumulation occurs in the footing despite tarp efforts. Preparations for the concrete pour involve scheduling the truck and confirming neighbor assistance. Rebar installation emphasizes safety with caps and wire chairs. The concrete pour reveals adjustments for slump and splattering challenges, leading to some waste. After the pour, plans for form removal and block masonry work indicate progress in the construction journey.
Up Next in Trending Episodes
-
S2E15 Framing & Lifting Walls
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor b...
-
S4E18 Full Cost Breakdown Our Radiant...
-
S3E15 Festival Preparations and Ongoi...
Preparations for a festival involve setup and addressing noise concerns. Work at the Chateau includes mold making and spray application, while flooring progress focuses on installing joists for safety. A gift from Valeria, a water bottle for the pool, adds excitement. Skirting board installation ...