S1E16 Complicated Roof Framing
Trending Episodes
•
TV-PG
The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window placement issues, and the use of a temporary platform for safety. Plans for roof fabrication, a weather barrier installation, and job site hygiene facilities are also discussed.
Up Next in Trending Episodes
-
S1E33 Millwork Details
Explore the essential processes of countertop templating and millwork installation. Timely templating and protecting unfinished cabinetry are crucial. The content covers cabinetry fabrication, connection methods, and the importance of precise cuts. A new track saw is introduced for enhanced power...
-
How to Install a Window with No Fins,...
-
S1E8 Navigating Septic System Challenges
The septic system faces significant challenges due to a failed test and an unsuitable site, leaving the property in jeopardy. The process includes conducting a perk test to analyze soil layers, but large rocks complicate excavation efforts. Plans are underway to explore additional land for potent...