Live stream preview
S1E14 Understanding Structural Detail Walls and Shear Walls (Global)
Trending Episodes
•
10m
Up Next in Trending Episodes
-
S2E6 More Rotten Floor...
The West Wing tower inspection shows a new roof and solid timber, with no leaks found. Insulation is added for warmth and reduced oil use. During the renovation of the downstairs toilets, old fixtures are removed, revealing soft joists that require replacement. Plans are set to fix the flooring a...
-
S1E36 Two Home Offices (Global)
-
S1E15 Plywood edge doors?
The shop is working on projects for HUD care architects, focusing on material selections to meet client expectations. They discuss constructing doors with ash veneer and plywood edges, sourcing poplar veneer core, and the challenges of large plywood doors. Techniques for applying veneers and cabi...