S1E11 Navigating Well Drilling After Hurricane Ida
Trending Episodes
•
TV-PG
A property undergoes assessment following Hurricane Ida, leading to an application for a well permit due to new township regulations. The well location is carefully staked to meet setback requirements. After interviewing multiple drilling contractors, drilling begins but faces delays due to engine failure. Once resolved, the drilling yields a satisfactory water flow rate. The total cost and plans for grouting and connecting the well to the house are discussed.
Up Next in Trending Episodes
-
Why Windows on Traditional homes matt...
-
Insulating Historic Homes: Balancing ...
Brent explores the challenges of insulating historic houses while maintaining their architectural integrity. He details three projects that showcase the unique difficulties posed by age and construction. The risks of foam insulation, particularly moisture retention, are discussed. Brent emphasize...
-
S2E10 Cleaning the Chateau with Tooth...
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...