S1E11 Finding the Control Lines
Trending Episodes
•
11m
Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separate system with a filter fabric and access manhole. Next, the first floor framing will be installed, including structural materials and subflooring.
Up Next in Trending Episodes
-
S1 E1 - How to
Explore the process of constructing homes that reflect character and narrative. The focus is on historical architecture and craftsmanship, using traditional methods. Key details in construction, from materials to design, create a cohesive story within the home. A kitchen designed with a 1940s aes...
-
S1E23 Pouring Concrete Footings
Water management presents challenges during construction as significant accumulation occurs in the footing despite tarp efforts. Preparations for the concrete pour involve scheduling the truck and confirming neighbor assistance. Rebar installation emphasizes safety with caps and wire chairs. The ...
-
S2E2 Prepping for the Stairs
The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets...