Live stream preview

Next video will start in 30 seconds

S2E11 The Slab Pour was a Disappointment

Close Open

S1E10 Progress Update on Erosion Control and Seeding

Trending Episodes • 7m 35s

Up Next in Trending Episodes

  • S2E11 The Slab Pour was a Disappointment

    Rain complicates the concrete pour, requiring a tarp over the foundation. Slab work is prepared with specific materials for drainage, but the resulting slab quality is poor, prompting an epoxy application. The contractor does not meet expectations, emphasizing the need for a signed contract. Key ...

  • S2E6 Gutter Downspout Drains & Backfi...

    The project focuses on passing plumbing and foundation inspections while addressing downspout drains and backfilling the foundation. A general layout of pipes is established using cost-effective materials. Backfilling is balanced on both sides, and insulation is installed. Unexpectedly, a stealth...

  • S1E18 Repairing Rotten Joists and Pre...

    Structural repairs take priority as Gavin and Nicole tackle rotten joists, replacing damaged sections with new timbers and treating exposed wood with borax gel for long-term protection. Layers of old paint are stripped back from beams and carefully neutralized, preparing the walls for breathable ...