S8 E3 Work Has Begun On The Châteaus’s Hallway Parquet Flooring!
New Episodes
•
TV-PG
The week starts with a focus on sleep and daily tasks. Plans include painting the ceiling while someone works on the floor. The search for a chandelier continues, with discussions on color choices and ceiling design. Outdoor tasks like garden leveling are planned, and the utility room is organized. Changes to the kitchen and dining room layout are considered, and the day ends with reflections on gifts and evening plans.
Up Next in New Episodes
-
S1E23 Structural Engineer Walkthrough...
-
S3E11 Plastering a Curved Wall
Plastering work focuses on achieving crisp corners and proper ceiling construction. There are delays in window installation, but efforts are underway to replace existing windows. A technical breakdown of radius wall construction emphasizes setup and accuracy. Insights into staircase construction ...
-
S1E12 A Complex Plumbing Job
Explore the intricate plumbing system installation in a luxury home, detailing the journey from the water line to the sewer line. Key aspects include high-quality craftsmanship, fixture placement, and the functionality of water stops. The role of a constant pressure pump, expansion tank, and the ...