S5E8 Vapour Control Layer Installation
New Episodes
•
TV-PG
The CIGA system installation focuses on creating a vapor barrier in the upstairs and garage ceiling to prevent moisture issues. It aims for maximum airtightness to enhance heating, cooling, and ventilation efficiency. Key steps include cutting around electrical boxes, using specific taping techniques, and addressing challenges like sloped ceilings. Weather impacts the schedule, but final sealing and window sealing ensure readiness for drywall installation and future blower door testing.
Up Next in New Episodes
-
S2E21 Window Installation
Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...
-
S1E5 Structural Engineer & Builder Wa...
The project at 45 White Oak in Wellesley, Massachusetts showcases significant construction progress. Structural engineer Ben Bulger discusses the impressive size and design of the building, focusing on off-site construction and retaining walls. Key topics include structural compliance, waterproof...
-
S1E5 Creating a Beautiful Balcony Garden
Explore the journey of cultivating a balcony garden that emphasizes artistic expression through plant selection and arrangement. The focus is on challenging plants and the importance of proper care, including watering techniques. Despite space limitations, vertical arrangements create a lush atmo...