S5E5 Ceiling Bulkhead Framing
New Episodes
•
12m
This project involves constructing a soffit around ductwork while adhering to building codes and ensuring proper insulation. The builder utilizes two by fours and a laser level for precision. The design features long and diagonal walls, with careful measurement planning. The construction includes mounting a ledger, erecting vertical walls, and connecting components. Challenges include cutting angles and fitting. The project wraps up with insulation plans and drywall preparation.
Up Next in New Episodes
-
S2E2 Three Months Till Move In
A family welcomes viewers to their renovation journey of an old house, designed for their seven-member household. As they run an interior design firm, they use their home as a creative space. They feel an emotional connection to the house, celebrating their progress and unique design features. Th...
-
S1E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...
-
S1 E5 - Electrical
Explore the journey of electrical systems and lighting from the 1880s to today. Discover the shift from gas lighting to electrical systems and the rivalry between AC and DC power. Learn about the evolution of wiring and the significance of preserving architectural integrity with historic lighting...