Live stream preview

S3E9 2 Coat Plaster on the Ceilings

TV-PG rating icon
New Episodes

Up Next in New Episodes

  • S2E6 46 Corner Footing

    Construction is advancing with the placement of concrete for phase one footings and the installation of vertical rebar. Three concrete trucks and a pump are on site. Preparations for waterproofing and drainage systems are underway. A meeting with Seagate addresses air sealing strategies and desig...

  • S1E10 A Borneo Private Garden

    A private garden in Coing, Malaysia showcases an impressive collection of tropical plants. The owner creatively arranges unique specimens, including a large philodendron beier and various begonia varieties. The tour features rare anterium, jade ventilation blocks, and diverse acacia species. View...

  • S2E10 Cleaning the Chateau with Tooth...

    Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...