Live stream preview

Next video will start in 30 seconds

S1E15 Crumbling Joists: A Major Setback

Close Open

S3E5 Installing Our Well Pump

New Episodes • 10m

Up Next in New Episodes

  • S1E15 Crumbling Joists: A Major Setback

    Renovation progresses after seven months, uncovering significant structural issues like crumbling joists and lentils. The removal of the fireplace reveals original brick, shifting priorities. Creating access involves lifting flooring, presenting challenges. A partnership with WILD promotes eco-fr...

  • S2 E7 WE MADE A MISTAKE IN THE CHATEA...

    The renovation process includes painting and varnishing edges, preparing for wallpaper, and careful sanding. Wiring for lighting requires isolation and replacement. Shopping for a chandelier highlights budget issues and limited selection. The toilet renovation involves replacing joists and instal...

  • S1E11 Finding the Control Lines

    Framers start work on the foundation, ensuring precise alignment with a control line. The foundation is smoothed and sealed for airtightness. Lumber is prepared, with adjustments made for discrepancies. A drainage system connects downspouts to galleys, while groundwater is managed through a separ...