S3E20 Framing Lifting Staircase Solo Aside From The Deck
New Episodes
•
20m
Stair construction experiences an eight-month delay as other tasks take priority. The builder uses stringers, measuring rise and tread accurately with tools like stair gauges and a framing square. A mock-up ensures proper fit, and stringers are cut with precision. Installation addresses challenges like concrete dips, and a temporary railing is added. The project concludes successfully, emphasizing the importance of careful planning to avoid issues.
Up Next in New Episodes
-
S1E16 Complicated Roof Framing
The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window p...
-
S1 E2 Colonial Williamsburg
Colonial Williamsburg serves as a prime travel destination for Master Builders, showcasing its historical importance as Virginia's early capital. The site features 1920s reconstruction efforts that bring American history to life. Visitors experience vibrant interactions with costumed characters a...
-
S1E37 Exterior building details
Custom shutters and gutters enhance both the aesthetic and functionality of a home. Authentic hardware is used for shutter installation, while gutters feature a half-round design made of coated aluminum. The entryway showcases reclaimed brick and a bluestone patio. Interior elements include mediu...