S3E20 Framing Lifting Staircase Solo Aside From The Deck
New Episodes
•
20m
Stair construction experiences an eight-month delay as other tasks take priority. The builder uses stringers, measuring rise and tread accurately with tools like stair gauges and a framing square. A mock-up ensures proper fit, and stringers are cut with precision. Installation addresses challenges like concrete dips, and a temporary railing is added. The project concludes successfully, emphasizing the importance of careful planning to avoid issues.
Up Next in New Episodes
-
S3E8 Painting our entry doors was a h...
Painting entry doors requires careful material selection and technique. Common mistakes include using flat paint, which attracts dirt. Proper preparation, like sanding and using the right tools, is essential for a quality finish. Attention to detail during installation ensures doors are level and...
-
S2 E6: Thistle Hill - ThisMassive Res...
Thistle Hill, a historic mansion in Fort Worth, has undergone a significant restoration. The project highlights the mansion's connection to the Winfield Scott Mansion and details the challenges faced, particularly with the roof and original windows. The restoration process emphasizes historical a...
-
S2E10 Built in Cabinets around Mansar...
The episode covers the assembly of cabinet pieces, highlighting on-site challenges that require disassembly and rebuilding. Design adjustments address hinge and depth issues, with a focus on selecting specialty hinges for a perfect fit. The installation process features careful door mounting, pre...