S3E15 Drain & Vent Pipe Rough-In
New Episodes
•
24m
Plumbing installation starts with understanding gravity and pipe routing. It includes drain plumbing for heating and main stacks, integrating radon and toilet stacks. A PowerPoint plan addresses venting with air mittens valves. Proper gluing and clean joints are crucial. Challenges in fitting and height require math for estimates. The kitchen plumbing run focuses on slope and drain placements, concluding with preparations for pressure testing.
Up Next in New Episodes
-
S1E19 Open Living Room Concept
The update highlights the advancements in the Steve Teak project and Cassie Garner Interiors, focusing on the design of the homework loft and its connection to the main house. It covers roof framing techniques, interior design adjustments, and the introduction of a future laundry room. The kitche...
-
S1E14 Bringing Stone Walls Back to Life
Renovation efforts encounter delays, with a planned resumption in November. Workers are currently focused on lime removal and conducting quality checks. Future tasks include wall removal and preparation for underfloor heating. Structural challenges arise from rotten joists and moisture damage. A ...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...