S3E13 The Beginning of a Long Journey
New Episodes
•
17m
A bright Monday morning features an update on a YouTube channel managed by Bethany, who compiles videos sent via email. Some videos were missed due to corrupt emails, but Tony's assistance with block work simplifies the process. Construction progress includes discussions on block heights and future work plans. Preparation for flooring installation focuses on joists, while window furniture restoration and travel preparations are also addressed.
Up Next in New Episodes
-
S1E15 Framing the Second Floor (Global)
-
S3E8 Preparing for Renovations and Gu...
The process includes proper storage of materials, workspace organization, and renovation preparations. A temporary floor is created for safety while existing structure issues are addressed. Household chores are managed alongside guest preparations, including plumbing work and cleaning. Outdoor ta...
-
S2E5 Back to DIY
After the holidays, work resumes with a focus on completing the en suite shower. Inspections show wall issues that require a wall lump removal for proper tile placement. Other tasks include checking for cracks and water damage in the flooring and beams. Christmas decorations need organizing, and ...