S3E1 Hammering Through 12 Feet Of Ledge
New Episodes
•
TV-PG
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment. Retaining wall designs adapt to conditions, and the home layout enhances outdoor views while minimizing wetland impact. The lengthy approval process is noted, concluding with updates and purchasing options.
Up Next in New Episodes
-
S1E3 Swiss construction site with int...
-
The Importance of Historic Moldings i...
Moldings are essential in architectural design, especially those from before 1950. Modern moldings often lack the clarity and aesthetic appeal of traditional styles. The focus is on the readability of molding design, with critiques of clamshell moldings for their lack of detail. Effective molding...
-
S3E3 Wood Grain Garage Doors
Garage door installation day is filled with excitement as the area is prepped for Clopay doors. A site check confirms measurements and installation details, while electrical wiring for door openers is planned. The Door Imagination System helps select door styles and colors. The professional team ...