S2E9 2 Coat Plaster on the Ceilings
New Episodes
•
TV-PG
The Back Bay project showcases advancements and hurdles in construction. A 3D scanning process is utilized for precise measurements, helping to identify issues and plan effectively. Plastering techniques with blueboard ensure high-quality finishes, while fixed cabinetry dimensions guarantee accurate fabrication. The staircase is crafted off-site to meet specific dimensions, emphasizing quality. The plastering process highlights the importance of quality and an artistic approach.
Up Next in New Episodes
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...
-
S1E32 Building Details Come Together
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed bri...
-
S2E5 Decisions in Stone and Space as ...
From the moment they step into their new-old house, Lauren and David feel a pull that reinforces why they chose this place—and why they’re ready to make it their own. Early design decisions shift from wallpaper choices to settling on mortar over flagstone in the foyer, balancing aesthetics with p...