S2E8 Sound Attenuation & Insulation

New Episodes • 7m 23s

Up Next in New Episodes

  • S1E4 Overcoming Challenges in Snowy E...

  • S1E21 Window Installation

    Significant progress is made on the roof installation, with the roof framing completed and window installations underway. The team focuses on selecting synthetic slate materials for an authentic look and addresses the complexities of curved valleys. Proper framing and drainage are emphasized in t...

  • S3E11 Heated Slab Tests

    The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored....