S2E8 Backfilling, Leveling, and Compacting Gravel under Slab
New Episodes
•
TV-PG
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent slab height. A plate compactor stabilizes the surface to prevent cracking. Finally, insulation board, vapor barrier, and rebar grid are set up before pouring concrete.
Up Next in New Episodes
-
S2 E19 Does DIY Every Day Turn You Cr...
Challenges in tile installation lead to seeking help for heavy tiles and sewing tasks. Curtain installation focuses on design choices, while plans for window and door renovations are postponed. A present is unboxed, revealing useful items. In the garden, efforts are made to clean up overgrown are...
-
S1E16 Curved exterior moulding
The episode covers the entryway installation process, starting with the removal of the old structure. It addresses corbel issues, including insect damage and rot. Piloters are installed using scribing techniques, and rot-resistant wood is utilized for durability. New electrical boxes are added, a...
-
S2E5 Decisions in Stone and Space as ...
From the moment they step into their new-old house, Lauren and David feel a pull that reinforces why they chose this place—and why they’re ready to make it their own. Early design decisions shift from wallpaper choices to settling on mortar over flagstone in the foyer, balancing aesthetics with p...