S2E8 Backfilling, Leveling, and Compacting Gravel under Slab
New Episodes
•
12m
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent slab height. A plate compactor stabilizes the surface to prevent cracking. Finally, insulation board, vapor barrier, and rebar grid are set up before pouring concrete.
Up Next in New Episodes
-
S3E5 Installing Our Well Pump
Preparing a water well involves installing a well pump and connecting it to a pressure tank, often with professional assistance. Key considerations include choosing between DIY and hiring experts, understanding pump specifications, and addressing installation challenges like pitless adapters. Mai...
-
S1E17 Can you see the difference?
The process covers decisions on wallpapering and flooring, emphasizing linseed oil for protection. Bathroom renovations include a color change and a feature wall, with a shift to varnishing the floor. Insulation installation is planned for colder weather. Challenges with paint removal create frus...
-
S1E3 Exciting Progress
The project moves forward with completed foundation work and preparations for underground utilities and framing. HVAC, plumbing, and electrical teams finalize details before concrete pouring. Framing begins, creating standing walls and excitement about the house's shape. Recent developments inclu...