S2E6 More Rotten Floor...
New Episodes
•
TV-PG
The West Wing tower inspection shows a new roof and solid timber, with no leaks found. Insulation is added for warmth and reduced oil use. During the renovation of the downstairs toilets, old fixtures are removed, revealing soft joists that require replacement. Plans are set to fix the flooring and joists. The driveway is also cleared of mud and grass to improve access during inclement weather.
Up Next in New Episodes
-
S1E14 Bringing Stone Walls Back to Li...
Work slows as Gavin and Nicole pause the renovation to address lime removal and reassess next steps before restarting in November. As walls are opened and checked, rotten joists and moisture damage come to light, reshaping plans for underfloor heating and future structural work. A new laser measu...
-
S2E10 New Driveway Begins
The project kicks off with enthusiasm for the job site trailer. Construction advances as the basement slab is completed and rebar is installed for load-bearing walls. A drainage system is established to handle water around the foundation. Additional fill is added for a new driveway, and the lot i...
-
S1E4 Lighting, Bathtub Install, and W...
Lauren and David push their renovation forward with electrical updates, HVAC adjustments, and a stunning antique copper bathtub that anchors their design vision. They experiment with layered lighting to shape mood and warmth while involving their daughters in choosing nature-inspired wallpaper. A...