S2E6 More Rotten Floor...
New Episodes
•
13m
The West Wing tower inspection shows a new roof and solid timber, with no leaks found. Insulation is added for warmth and reduced oil use. During the renovation of the downstairs toilets, old fixtures are removed, revealing soft joists that require replacement. Plans are set to fix the flooring and joists. The driveway is also cleared of mud and grass to improve access during inclement weather.
Up Next in New Episodes
-
S1E13 Framing with KD vs Engineered L...
Explore the key aspects of construction in Needham, focusing on roof and wall framing. The assembly of trusses and effective ventilation strategies are discussed, highlighting the decision to avoid spray foam for better air tightness. The framing of a two-story wall is examined, emphasizing mater...
-
S1E2 Dream Big in a tiny Tropical Gar...
Join Farron as he shares his gardening journey, starting from his initial challenges four years ago. He discusses plant care techniques, including watering and fertilization, and reflects on the changing availability of certain plants. The conversation covers various species, their growth pattern...
-
Frame to Finish: Trailer
Frame to Finish with Nick Schiffer is a behind-the-walls journey into the heart of luxury homebuilding — led by one of the most trusted and respected names in the craft. Nick Schiffer, founder of NS Builders, invites you onto the job site as he brings stunning high-end homes to life, step by step...