S2E34 Interior Paint Prep
New Episodes
•
TV-PG
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVAC system is enhanced for fresh air circulation. Kitchen cabinetry installation features a coffee station, and protective measures are in place to prevent damage during construction.
Up Next in New Episodes
-
S3E3 Fixing Our Moisture Control
The site visit highlights moisture prevention strategies in the Back Bay location. It emphasizes using subfloor and coatings to keep moisture out of living spaces and addresses concerns about soil moisture affecting hardwood floors. A six mill poly vapor barrier is installed to mitigate moisture ...
-
Frame to Finish: Trailer
Frame to Finish with Nick Schiffer is a behind-the-walls journey into the heart of luxury homebuilding — led by one of the most trusted and respected names in the craft. Nick Schiffer, founder of NS Builders, invites you onto the job site as he brings stunning high-end homes to life, step by step...
-
How to Build a Front Porch
High-end residential architecture often faces design issues, particularly with columns and porches. Many expensive homes show significant flaws, such as misaligned columns and improper window proportions. The content emphasizes the importance of structural relationships and visual strength in col...