S2E34 Interior Paint Prep
New Episodes
•
TV-PG
The renovation project shows significant progress with completed exterior painting and chimney pot installation. The second floor is being prepped for paint, and two fireplaces are installed. Landscaping transitions are in progress, and electrical updates provide a permanent power switch. The HVAC system is enhanced for fresh air circulation. Kitchen cabinetry installation features a coffee station, and protective measures are in place to prevent damage during construction.
Up Next in New Episodes
-
S1 E3 Winterthur Period Interiors
Winter Tour showcases Henry DuPont's family home, featuring a collection of American antiques and entire rooms from various periods. Visitors can explore five highlighted rooms, including the Cecil bedroom with its Georgian wall, the beautifully composed Hampton bedroom, the quirky Penny Packer r...
-
S1E 10 Reviving a Heritage Property i...
A family arrives in England to reconnect with relatives and share their property, which includes a farmhouse and swimming pool. They discuss garden maintenance, focusing on clearing weeds to uncover grapevines. The history of a significant cottage is revealed, along with plans for field managemen...
-
S1E1 Hammering Through 12 Feet Of Ledge
The project showcases 45 white oak residents and emphasizes redefining builder grade through site work. It discusses the demolition of an existing home, collaboration with the fire department, and challenges from site elevation and ledge. Excavation impacts costs but reinforces design commitment....