S2E32 Building Details Come Together
New Episodes
•
TV-PG
Work continues on the home’s exterior and interior, overcoming challenges from rainy days. The exterior paint is finished, and Boral material is used for construction. Key techniques include tucking aluminum flashing and hand-forming lead around windows. Inside, the mudroom features reclaimed brick tile, while kitchen cabinetry is being installed. A bunk bed is being crafted to match the trim, and air conditioning units are set up to manage humidity.
Up Next in New Episodes
-
S2E11 Hidden Built-Ins
The project revisits a cabinetry design under a mansard roof, tackling initial challenges with white oak interiors and hinge compatibility. It details the installation of drawers and servo drives for hidden doors, enhancing storage for seasonal items. The design process includes collaboration wit...
-
S2E7 Rebar Ready
The site visit in Needham focuses on key construction topics such as concrete footings, waterproofing techniques, and rebar importance. Methods to prevent capillary action and manage water intrusion are discussed, along with cold joint management for structural integrity. The team outlines a phas...
-
S5E5 Ceiling Bulkhead Framing
This project involves constructing a soffit around ductwork while adhering to building codes and ensuring proper insulation. The builder utilizes two by fours and a laser level for precision. The design features long and diagonal walls, with careful measurement planning. The construction includes...