S2E3 Fixing Our Moisture Control
New Episodes
•
TV-PG
The site visit highlights moisture prevention strategies in the Back Bay location. It emphasizes using subfloor and coatings to keep moisture out of living spaces and addresses concerns about soil moisture affecting hardwood floors. A six mill poly vapor barrier is installed to mitigate moisture issues. The installation of steel beams for structural support is detailed, along with the design of the staircase. The overview concludes with upcoming framing work and layout consistency.
Up Next in New Episodes
-
S1E1 A Hidden Tropical Garden Built A...
Tucked away in Jakarta, this hidden tropical garden unfolds as a deeply personal landscape shaped by water, plants, and quiet intention. Irene Chen explores a layered ecosystem where a swimming pool flows into a fish pond, iconic plants from around the world thrive side by side, and a natural gro...
-
S5E12 Setting Up Security
A security camera system is established using blue wires and various components, connecting to a network video recorder for continuous recording and internet access. The setup prioritizes local storage to avoid subscription fees. The installation process includes cable termination and organizatio...
-
S2E7 Walls to Wiring
The project includes painting and varnishing surfaces, preparing for wallpapering, and tackling sanding challenges. It also covers electrical work, such as isolating and replacing outdated wiring. Budgeting for chandeliers and finding unique items in shops are discussed. The toilet renovation inv...