S2E3 Excavation in New England Weather
New Episodes
•
TV-PG
The Needham project showcases collaboration with TE Design Group, emphasizing demolition and site work. Groundwater management is essential, with design changes for seasonal adjustments. The foundation elevation is set to prevent flooding, while excavation faces challenges with shale and ledge. Water management strategies are in place for a dry site, and a geo engineer assesses soil. Protection for a sweet gum tree is prioritized, with plans for foundation work and drainage setup ahead.
Up Next in New Episodes
-
S1E3 What is Colonial Revival Archite...
Colonial Revival architecture, inspired by the colonial period from 1890 to 1940, showcases key styles like Georgian, Federal, and Greek Revival. Accurate architectural details, such as moldings and door casings, are essential for authenticity. The historical use of shutters and their design, alo...
-
S2E19 Structural Ridge Beam Installation
The house build series kicks off with an overview and the framing of the first floor. A local Amish crew is hired for complex tasks. Despite challenges with heavy materials and humidity, progress is made on the subfloor. Wall framing and window openings are checked, and the ridge beam is installe...
-
S2E16 Complicated Roof Framing
The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window p...