S2E2 Prepping for the Stairs
New Episodes
•
11m
The Back Bay project focuses on installing materials and managing moisture for brick, emphasizing the importance of a strong bond and good brick condition. It utilizes stable framing materials like FLS and LVLs. Staircase reinforcement addresses movement and noise, while steel reinforcement meets structural code requirements. Existing plumbing and walls present challenges that require innovative solutions. Upcoming steps involve installing steel to maintain structural integrity in compliance with regulations.
Up Next in New Episodes
-
S5E7 Making An Air Tight House
A vapor control layer is installed to create an airtight envelope, improving comfort and heat pump efficiency. The unique properties of the CIGA product protect wall assemblies from moisture. Air sealing techniques, including specialized tapes and sealing around windows and doors, are employed to...
-
Mastering Mortise Locks: Repair and M...
Brent Hole explores the world of home locks, focusing on the durability of mortise locks in pre-1940 houses. He details the lock mechanism and its components, demonstrating how to disassemble, clean, and lubricate these locks. Brent highlights the importance of identifying original hardware and e...
-
S3E1 Main Electrical Service Panel In...
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...