S2E2 New Build Site Prep
New Episodes
•
TV-PG
A new construction project in Needham begins with collaboration from architect Steve Teak. The project starts with demolition, including erosion control and fire department oversight. Site preparation involves tree protection and designated contractor parking. Neighbors are kept informed about construction activities. Supply chain issues pose challenges, particularly affecting dumpster availability. Future updates will provide more information and encourage audience engagement.
Up Next in New Episodes
-
S1E5 The 1908 Italian Revival
The renovation of an Italian revival house includes updates to exterior paint and architectural features. A unifying paint color is essential for preservation. The new HVAC system enhances heating and cooling. Window designs are being restored, focusing on divided light versus open light options....
-
S3E14 Air Sealing the Brownstone
The project focuses on installing reclaim beams and blueboard to improve air tightness and ventilation in homes. Reclaimed timbers are used for architectural features, while beam installation ensures structural support. Blueboard is essential for plastering, contributing to air tightness. Blower ...
-
S2E35 Solid Hemlock Beams
Explore the design and installation of beams in a home, focusing on solid hemlock for stability. Understand the wood drying process and its effects, along with installation techniques for anchoring and plastering beams. Discover design features like light wells and flared windows that enhance nat...