S2E18 Framing the Floor with I-Joists
New Episodes
•
TV-PG
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-span blocking is added for stability, and sheeting is installed for a flat surface. Future plans include second floor framing.
Up Next in New Episodes
-
S1E21 Window Installation (Global)
-
S3E6 Framing Cost Breakdown
Framing a garage apartment involves various expenses and procurement techniques. Stick frame construction is chosen for its structural benefits over post frame. Key material costs include dimensional and engineered lumber, sheathing, metal, and fasteners. Labor and tool expenses are also consider...
-
S3E4 Trenching for our Well Water Line
A team digs a trench for a waterline from the well to the house while celebrating Alex's 27th birthday. They face challenges with rocks and soil, using a mini excavator for excavation. Confusion arises over pipe measurements, but progress continues despite tough conditions. As they prepare to ins...