S2E18 Framing the Floor with I-Joists
New Episodes
•
10m
Construction starts on the floor platform with a two-day timeline before the Amish crew arrives. Lumber is moved, and materials cost under $6,000. Temporary scaffolding aids in laying the floor system. A telehandler is introduced for lifting heavy eye joists, which are doubled for strength. Mid-span blocking is added for stability, and sheeting is installed for a flat surface. Future plans include second floor framing.
Up Next in New Episodes
-
S1E4 Transforming the Property
A couple embarks on a renovation journey in Wales, tackling challenges like weather and a large stump. They build a rain shelter and parking bay while enhancing their garden. As they gather materials and discuss future projects, they explore a barn, assessing its potential. The week ends on a pos...
-
S2E8 Backfilling, Leveling, and Compa...
The process begins with preparing the foundation by filling it with a four-inch layer of three-quarter inch clean stone. Proper insulation placement is crucial, along with radon gas mitigation using a PVC pipe for ventilation. Leveling techniques, including a string line method, ensure consistent...
-
S3E5 Installing Our Well Pump
Preparing a water well involves installing a well pump and connecting it to a pressure tank, often with professional assistance. Key considerations include choosing between DIY and hiring experts, understanding pump specifications, and addressing installation challenges like pitless adapters. Mai...