S2E1 Transforming a Brownstone: Renovation Insights
New Episodes
•
11m
This project showcases a brownstone renovation that prioritizes air tightness and significant improvements. A Preco product is used to tackle moisture and air issues. The process includes wall preparation, floor leveling techniques, and addressing renovation challenges. The staircase design transitions from a standard winder to a natural spiral, enhancing aesthetics. Collaboration with John Buckley Architects is emphasized, with updates promised for the future.
Up Next in New Episodes
-
S5E4 Sound and Fire Proofing
Insulation installation prioritizes soundproofing and fire resistance in an apartment layout featuring a kitchen, sitting area, and bathroom. Safe and sound insulation is chosen for its density and fireproofing. Challenges include fitting insulation around framing irregularities, requiring precis...
-
S2E12 Sequencing Wood Veneer
The kitchen project update highlights the fitting of appliances and the critical role of accurate measurements. Challenges with routing edge poles for the dishwasher are discussed, emphasizing the need for precision in the shop. Hardware installation features a jig for handle mounting. Issues wit...
-
S2 E11 Surprise Delivery from Canada!
Renovation updates include progress on lighting and flooring installations. Ceiling work features fan installation and joist repairs. Plans are in place for painting radiators and walls to create a cohesive aesthetic. Challenges with wallpaper and delays in parts are noted. A thoughtful gift from...