S1E8 Demolition Chaos as Ceilings Come Down and Plans Take Shape
New Episodes
•
TV-PG
Demolition ramps up as Gavin and Nicole strip ceilings and walls back to expose the true condition of their Welsh smallholding. Damp issues and poor past work come to light, reinforcing the need for breathable materials and proper structural upgrades. As usable materials are salvaged and waste is cleared, plans take shape for new plumbing and underfloor heating. Kitchen demolition brings its own challenges, but steady progress—and a brief break at the beach—helps reset before the next phase of the build.
Up Next in New Episodes
-
S2E10 Cleaning the Chateau with Tooth...
Preparation for a mirror frame starts with a red paint base for gold leaf application. The molding is progressing well, with about 30 hours of work remaining. After sanding damage, repairs are made to the main mold, and the base coat dries before gold leaf is added. Cleaning surfaces is crucial, ...
-
S1E10 Progress Update on Erosion Cont...
Dirt moving is nearly finished, emphasizing erosion control. Grass seed is applied ahead of rain, while rock picking is a major focus, ensuring back safety. Wildlife, especially deer, is present. Seeding faces challenges from rain and hot, humid conditions. After two to three weeks, seed germinat...
-
Mastering Gable and Returns in Archit...
Brenda explores the significance of gable and returns in architecture, pointing out common mistakes like pork chop ends and poor roofing techniques. She discusses historical design principles, emphasizing proportional relationships among elements. Brenda offers gutter design recommendations to im...