Live stream preview

Next video will start in 30 seconds

S2E9 Slab Prep for Radiant Heat

Close Open

S1E36 Two Home Offices

New Episodes • 9m 19s

Up Next in New Episodes

  • S2E9 Slab Prep for Radiant Heat

    Insulation is placed outside to prevent mice and is distributed under the concrete slab for thermal efficiency. A vapor barrier and rebar grid are added for moisture control and support. Insulation panels are carefully cut around plumbing. Water is removed from the sump pit, and rebar is installe...

  • S4E17 Doing Our HVAC Ductwork

    The project focuses on installing an HVAC system, emphasizing duct work design and installation. Extensive footage captures the process, highlighting challenges in DIY installation, including contractor knowledge and pricing. Consultation with design professionals aids in accurate duct sizing. Ma...

  • S1E3 Swiss construction site with int...