S1E2 Navigating Challenges: Permits to Foundations
New Episodes
•
9m 31s
High stress levels arise from delays and permit issues in the project. Excavation begins after obtaining the city permit, but unexpected water complicates the process. Effective team coordination helps manage pressures. The foundation work progresses with careful preparation for pouring footings, leading to a successful pour. The team anticipates the next construction phases, including underground utilities and framing, as the building shape starts to emerge.
Up Next in New Episodes
-
S1E22 Slate Roof Prep
The installation of traditional jelled wind flange windows involves nailing the flange and taping. Clients select Jein sight line pro windows based on samples for satisfaction. Interior design features include floor-to-ceiling windows and detailed molding. The framing incorporates a faux roof lin...
-
S3E1 Main Electrical Service Panel In...
A rainy day sets the stage for installing a 200 amp main electric service panel. The process includes setting up the panel, installing conduit, and following NEC code for guidance. A heat gun bends the conduit, and ground wire is connected. Wiring connections are made, including neutral and hot w...
-
S1E18 Repairing Rotten Joists and Pre...
Renovation efforts focus on resolving rot issues and preparing for new arrivals. Joists are repaired with new timbers and borax gel treatment. Paint stripping removes layers from beams, followed by neutralization. Online woodworking resources offer tutorials for all skill levels. Protective treat...