S1E16 Complicated Roof Framing
New Episodes
•
11m
The construction project at the teak design group showcases the introduction of Julian Miller and the transformation of the backyard. It highlights prefabrication for roof framing, material reuse strategies, and the complexity of roof design. Key updates include the design of staircases, window placement issues, and the use of a temporary platform for safety. Plans for roof fabrication, a weather barrier installation, and job site hygiene facilities are also discussed.
Up Next in New Episodes
-
S1E8 Navigating Septic System Challenges
The septic system faces significant challenges due to a failed test and an unsuitable site, leaving the property in jeopardy. The process includes conducting a perk test to analyze soil layers, but large rocks complicate excavation efforts. Plans are underway to explore additional land for potent...
-
S1E13 Framing with KD vs Engineered L...
-
S3E11 Heated Slab Tests
The radiant heating system installation requires careful coordination among various trades and thorough preparation. After extensive work, the system is filled with water and tested. Initial leaks lead to adjustments, and once the boiler and pump are activated, flow and temperature are monitored....