S1E14 Understanding Structural Detail Walls and Shear Walls
New Episodes
•
10m
The project introduces structural detail walls, defining shear walls and their role in construction. It discusses the first floor layout, including design surprises and wall framing details with plywood for strength. The installation of a continuous vapor retarder is highlighted for improved performance. The importance of an airtight home for climate control is addressed, along with the kitchen and living space layout. Updates on the second floor system and construction progress are also shared.
Up Next in New Episodes
-
Against the Clock: Trailer
-
S2E9 Moving Into Our New House
A tight timeline of a week and a half remains for moving into a new home. Construction meetings focus on HVAC and kitchen work. The process of finding a property and designing a unique living space highlights personal values. Distinct bathroom styles and favorite fixtures are showcased. Excitemen...
-
S2E4 Planting Wildflowers along the D...
Elena and Alex embark on a project at Mason Dixon Acres, planting Black-Eyed Susans along their driveway. They prepare their equipment and address concerns about plastic waste, emphasizing their recycling commitment. With dry weather and potential snow, they plan to cover seeds with straw and imp...