S1E12 Six Months In: Progress, Storm Damage, and a Farmhouse Taking Shape

TV-PG rating icon
New Episodes

Up Next in New Episodes

  • S5E4 Sound and Fire Proofing

    Insulation installation prioritizes soundproofing and fire resistance in an apartment layout featuring a kitchen, sitting area, and bathroom. Safe and sound insulation is chosen for its density and fireproofing. Challenges include fitting insulation around framing irregularities, requiring precis...

  • S1E1 How to build a (next level) cabi...

    The cabinet making process starts with unloading parts and using CNC machines for efficiency. Edge banding finishes the cabinet edges, followed by assembly, which includes cleaning, aligning, and securing the parts. Final touches involve cleaning the edges and preparing the cabinet for the next s...

  • S2E7 Rebar Ready

    The site visit in Needham focuses on key construction topics such as concrete footings, waterproofing techniques, and rebar importance. Methods to prevent capillary action and manage water intrusion are discussed, along with cold joint management for structural integrity. The team outlines a phas...