S1E11 Navigating Well Drilling After Hurricane Ida
New Episodes
•
14m
A property undergoes assessment following Hurricane Ida, leading to an application for a well permit due to new township regulations. The well location is carefully staked to meet setback requirements. After interviewing multiple drilling contractors, drilling begins but faces delays due to engine failure. Once resolved, the drilling yields a satisfactory water flow rate. The total cost and plans for grouting and connecting the well to the house are discussed.
Up Next in New Episodes
-
S2E15 Framing & Lifting Walls
The project kicks off on July 2nd, 2022, as the team eagerly frames their plans. They install sill plates and prepare for the first floor walls, collaborating with an Amish crew for the second floor. After confirming the foundation's dimensions, they lay out the sill plates and drill for anchor b...
-
S1E2 New Build Site Prep
A new construction project in Needham begins with collaboration from architect Steve Teak. The project starts with demolition, including erosion control and fire department oversight. Site preparation involves tree protection and designated contractor parking. Neighbors are kept informed about co...
-
S1E18 Sheathing the Swooping Roof
The project focuses on sheathing and WRB installation using self-adhered materials. Roof construction is progressing with careful framing and material selection. On-site trusses ensure proper support. The garage is prepared for concrete with moisture control. Interior walls are being built with a...