Live stream preview

Next video will start in 30 seconds

S2E23 Underground Electric | Trenching the FINAL 230ft

Close Open

S1 E12 - Trim and Millwork

New Episodes • 19m

Up Next in New Episodes

  • S2E23 Underground Electric | Trenchin...

    The process starts with borrowing a mini excavator and conduit for trenching a 220-foot underground run for a secondary electric service. A three-inch PVC conduit is installed under the slab to the utility room. Digging presents challenges, especially with rocks, as the team aims for the frost li...

  • S4E2 We Both Quit Our Jobs, Now What?

    A couple transitions from corporate jobs to self-employment, driven by their educational background and the limitations of traditional work. They document their entrepreneurial journey on YouTube, facing challenges in monetization but remaining committed to their goals. As they build income strea...

  • S3E16 Pressure Testing Our Drain-Wast...

    A drain piping system undergoes a pressure test to check for leaks. The inspector evaluates the system under pressure using components like bushings and gauges. Two methods are available: air pressure, which is easier for inspection, and water, which is more rigorous. Leak detection focuses on jo...