This project involves constructing a soffit around ductwork while adhering to building codes and ensuring proper insulation. The builder utilizes two by fours and a laser level for precision. The design features long and diagonal walls, with careful measurement planning. The construction includes mounting a ledger, erecting vertical walls, and connecting components. Challenges include cutting angles and fitting. The project wraps up with insulation plans and drywall preparation.
Up Next in Season 5
-
S5E7 Making An Air Tight House
A vapor control layer is installed to create an airtight envelope, improving comfort and heat pump efficiency. The unique properties of the CIGA product protect wall assemblies from moisture. Air sealing techniques, including specialized tapes and sealing around windows and doors, are employed to...
-
S5E8 Vapour Control Layer Installation
The CIGA system installation focuses on creating a vapor barrier in the upstairs and garage ceiling to prevent moisture issues. It aims for maximum airtightness to enhance heating, cooling, and ventilation efficiency. Key steps include cutting around electrical boxes, using specific taping techni...
-
S5E9 Waterproofing Our Shower
The project starts with creating a custom bathroom, focusing on shower installation. It covers framing, plumbing, and design features like radiant heat and niches. Key steps include drywall installation, adjusting the shower pan, and ensuring compliance with building codes. The process also detai...